Removal
Note mark the gearshift shaft head at which the gearshift link arm slit set for correct reinstallation. |
Installation
Install the engine sprocket in the reverse order of removal. Pay attention to the following points:
: Thread lock cement
99000–32110
(thread lock cement super “1322” or
equivalent)
Tightening torque engine sprocket nut (a): 145 n·m (14.5 Kgf-m, 105.0 Lbf-ft)
Tightening torque speed sensor rotor bolt (b): 28 n·m (2.8 Kgf-m, 20.0 Lbf-ft)
: Grease 99000–25010 (suzuki
super
grease “a” or equivalent)
Tightening torque speed sensor mounting bolt (c): 6.5 N·m (0.65 Kgf-m, 4.5 Lbf-ft)
Gearshift lever height “a” standard: 65 – 75 mm (2.6 – 3.0 In)
Gearshift lever
This motorcycle has a 6-speed
transmission which operates as
shown. To shift properly, squeeze
the clutch lever and close the
throttle at the same time you
operate the gearshift lever. Lift the
gearshift lever to upshift and
depress the lever to downshift.
Neutral is located between lo ...
Isc valve preset and opening initialization
When removing or replacing the isc valve, set the isc
valve to the following procedures:
turn the ignition switch on.
Set up the sds tool. (Refer to the sds operation
manual for further details.)
Click the “active control”.
Click the “isc learned value reset” (1) ...
Rear shock absorber inspection
Refer to “rear shock absorber removal and installation” .
Shock absorber
Inspect the rear shock absorber for damage and oil
leakage, and absorber bushing for wear and damage. If
any defect is found, replace the rear shock absorber with
a new one.
Caution
do not attempt to disassemble ...