
|
Rear fender construction
Rear view mirror constructionThrottle body components
Fuel delivery pipe
Fuel delivery pipe t-joint
O-ring
Tp sensor
Stp sensor
Secondary fuel injector
Primary fuel injector
Cushion seal
Isc valve
Air screw
Vacuum hose
Evap system purge control solenoid valve
For e-33 only
3.5
...
Pair control solenoid valve removal and
installation
Removal
Lift and support the fuel tank with the prop stay.
Refer to “fuel tank removal and installation” in section 1g .
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Remove the pair control solenoid valve (1) along
with the pair ...
Starter motor disassembly and assembly
Refer to “starter motor removal and installation” .
Disassembly
Disassemble the starter motor as shown in the starter motor components
diagram. Refer to “starter motor components” .
Assembly
Reassemble the starter motor in the reverse order of
removal. Pay attention to the following points:
...