
|
Rear fender construction
Rear view mirror constructionThrottle cable routing diagram
Throttle cable no. 1
Throttle cable no. 2
Clutch cablev
Front brake hose
Pass
the throttle cables in front of the front brake hose.
Pass the
clutch cable above the right air intake pipe.
Clamp the
clutch cable at the white taping point and m ...
Cylinder head disassembly and assembly
Refer to “engine top side disassembly” .
Refer to “engine top side assembly” .
Caution
identify the position of each removed part.
Organize the parts in their respective groups
(i.E., Intake, exhaust, no. 1 Or no. 2) So that
they can be installed in their original
locations ...
Special tools and equipment
Recommended service material
Note
required service material is also described in the following.
“Water hose routing diagram” “water pump components” “water
pump construction”
Special tool
...