Refer to “electrical components location” in section 0a .
Removal
Installation
Note be careful not to apply bond to the hole of thread end. |
: Sealant 99000–31140 (suzuki bond no.1207B or equivalent)
Tightening torque oil pressure switch: 14 n·m (1.4 Kgf-m, 10.0 Lbfft)
Tightening torque oil pressure switch lead wire screw (a): 1.5 N·m (0.15 Kgf-m, 1.1 Lbf-ft)
Oil pressure switch inspection
Refer to “oil pressure indicator inspection” in section 9c .
Throttle body removal and installation
Removal
Remove the side cowlings. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” .
Remove the clamps (1).
Disconnect the iap sensor (2) from the vacuum
...
Front brake components
Seal set
Piston and seal set
Brake pad spring
Brake pad set
Front brake disc
7.5
N·m (0.75 Kgf-m, 5.5 Lbf-ft)
15 N·m (1.5
Kgf-m, 11.0 Lbf-ft)
39 N·m (3.9
Kgf-m, 28.0 Lbf-ft)
18 N·m (1.8
Kgf-m, 13.0 Lbf-ft)
Apply thread lo ...
Engine assembly installation
Install the engine in the reverse order of engine removal.
Pay attention to the following points:
before installing the engine, install the collars (1).
Before installing the engine, install the engine
mounting thrust adjusters (2).
Gradually raise the rear side of ...