Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Oil pump removal and installation

Note

be careful not to drop any parts into the crankcase.

Removal

  1. Remove the oil pan, oil pressure regulator and oil strainer. Refer to “oil pan / oil pressure regulator / oil strainer removal and installation” .
  2.  Remove the oil pump driven gear bolt (1).
  3.  Remove the oil pump driven sprocket (2).
  4.  Remove the washer (3).

Suzuki GSX-R. Removal


  1. Remove the oil pump (4).

Suzuki GSX-R. Removal


  1. Remove the o-ring (5) and dowel pins.

Suzuki GSX-R. Removal


Installation

  1. Install the dowel pins.
  2.  Apply grease to new o-ring.
Caution

use a new o-ring to prevent oil leakage.

: Grease 99000–25010 (suzuki
super grease “a” or equivalent)

Suzuki GSX-R. Installation


  1. Install the oil pump.
Note

engage the oil pump shaft end with the water pump shaft slot.

Suzuki GSX-R. Installation


  1. Tighten the oil pump mounting bolts to the specified torque.

Tightening torque oil pump mounting bolt (a): 10 n·m (1.0 Kgf-m, 7.0 Lbf-ft)

Suzuki GSX-R. Installation


  1. Install the washer (1).
  2.  Install the oil pump driven sprocket (2) with the chain (3).
  3.  Apply a small quantity of thread lock to the oil pump driven sprocket bolt (4) and tighten it to the specified torque.

: Thread lock cement
99000–32110 (thread lock cement super “1322” or equivalent)

Tightening torque oil pump driven sprocket bolt (b): 10 n·m (1.0 Kgf-m, 7.0 Lbf-ft)

Suzuki GSX-R. Installation


  1. Install the oil pan, oil strainer and oil pressure regulator. Refer to “oil pan / oil pressure regulator / oil strainer removal and installation” .
Oil jet inspection
Refer to “oil jet removal and installation” . Oil jet Make sure that the oil jets are not clogged. If they are clogged, clean their oil passage using a wire of the proper size and compressed air. ...

Oil pump inspection
Inspect the oil pump in the following procedures:  remove the oil pump. Refer to “oil pump removal and installation” .  Rotate the oil pump by hand and check that it moves smoothly. ...

Other materials:

Pair system inspection
Inspect pair system every 12 000 km (7 500 miles, 24 months) Inspect the pair (air supply) system periodically. Refer to “pair system inspection” in section 1b . Throttle valve synchronization Inspect throttle valve synchronization initially at 1 000 km (600 miles, 2 months) (e-33 only) and ...

Front brake master cylinder components
Reservoir cap Plate Diaphragm Reservoir tank Master cylinder Dust boot Piston set Brake lever Brake lever pivot bolt Brake lever pivot bolt lock-nut Brake light switch Brake hose union bolt Brake hose 23 N·m (2.3 Kgf-m, ...

Engine oil level check
Check the engine oil level as follows:  Place the motorcycle on level ground on the side stand.  Start the engine and allow it to idle for a few minutes.  Stop the engine and wait three minutes. Hold the motorcycle vertically and check the oil level through ...

© 2011-2024 Copyright www.suzukigsxr.org