Removal
Refer to “fuel tank removal and installation” in section 1g .
Installation
Install the pair reed valve in the reverse order of removal. Pay attention to the following points:
: Thread lock cement
99000–32110
(thread lock cement super “1322” or
equivalent)
Tightening torque pair reed valve cover bolt (a): 10 n·m (1.0 Kgf-m, 7.0 Lbf-ft)
Starter motor removal and installation
Removal
Turn the ignition switch off and disconnect the
battery (–) lead wire (1).
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Disconnect the starter motor lead wire (2).
Remove the starter motor (3).
...
Special tools and equipment
Recommended service material
Note
required service material is also described in the following.
“Handlebar components” “steering components” “steering
damper construction”
Special tool
...
Fuel
Your motorcycle requires premium
unleaded gasoline with a
minimum pump octane rating of
90 ((r+m)/2 method). In some
areas, the only fuels that are
available are oxygenated fuels.
Oxygenated fuels which meet the
minimum octane requirement and
the requirements described below
may be used i ...