Inspect pair system every 12 000 km (7 500 miles, 24 months)
Inspect the pair (air supply) system periodically. Refer to “pair system inspection” in section 1b .
Throttle valve synchronization
Inspect throttle valve synchronization initially at 1 000 km (600 miles, 2 months) (e-33 only) and every 12 000 km (7 500 miles, 24 months)
Inspect the throttle valve synchronization periodically.
Refer to “throttle valve synchronization” in section 1d .
Throttle cable play inspection and adjustment
Cooling system inspectionRegulator / rectifier removal and installation
Removal
Turn the ignition switch off.
Remove the right side cowling. Refer to “exterior parts removal and
installation” in section 9d .
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Remove the evap system purge ...
Wiring harness routing diagram
Wiring harness no. 2
Tapping clamp
: insert the clamp from the front side. Place the turn signal
and position light couplers in front of the clamp.
Steel clamp
: clamp the wiring harness at the blue taping point. Bend
the steel clamps to the front side.
...
Component location
Electrical components location
Ignition switch/immobilizer antenna
Iat sensor
Secondary fuel injector
Primary fuel injector
Iap sensor
Evap system purge control solenoid valve
Fuel pump relay
Turn signal/side-stand relay
Cooling fan relay
Ect ...