Removal



Installation
Install the rear shock absorber in the reverse order of removal. Pay attention to the following points:
Tightening torque rear shock absorber upper mounting nut (a): 50 n·m (5.0 Kgf-m, 36.0 Lbf-ft) rear shock absorber lower mounting nut (b): 50 n·m (5.0 Kgf-m, 36.0 Lbf-ft)


Refer to “exterior parts removal and installation” in section 9d .
Rear suspension inspection
Refer to “rear suspension inspection” in section 0b .
Rear suspension assembly construction
Rear shock absorber inspectionRear brake light switch inspection
Inspect the rear brake light switch in the following
procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Disconnect the rear brake light switch lead wire
coupler (1).
Inspect the rear brake light swi ...
Pair control solenoid valve removal and
installation
Removal
Lift and support the fuel tank with the prop stay.
Refer to “fuel tank removal and installation” in section 1g .
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Remove the pair control solenoid valve (1) along
with the pair ...
Foreword
This manual contains an introductory description on the suzuki gsx-r1000 and
procedures for its inspection/
service and overhaul of its main components.
Other information considered as generally known is not included.
Read the general information section to familiarize yourself with the mot ...