Recommended service material

| Note required service material is also described in the following. “Front fork components” |
Special tool

Specifications
Rear suspensionEngine sprocket removal and installation
Removal
Remove the gearshift link arm (1) from the gearshift
shaft.
Note
mark the gearshift shaft head at which the
gearshift link arm slit set for correct
reinstallation.
Remove the speed sensor (2).
Remove the engine sprocket cover (3).
Support the ...
Special tools and equipment
Recommended service material
Note
required service material is also described in the following.
“Handlebar components” “steering components” “steering
damper construction”
Special tool
...
Break-in
The first 800 km (500 miles) is the
most important in the life of your
motorcycle. Proper operation during
this break-in period will help
assure maximum life and performance
from your new motorcycle.
The following guidelines explain
proper break-in procedures.
Maximum engine speed recommen ...