Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Specifications

Crankshaft thrust clearance inspection and selection
Refer to “engine bottom side disassembly” (page 1d- 49). Refer to “engine bottom side assembly” . Inspection With the crankshaft’s right-side and left-side thrust bearings inserted into the ...

Service data
Valve + guide unit: mm (in Camshaft + cylinder head unit: mm (in Cylinder + piston + piston ring unit: mm (in) Conrod + crankshaft unit: mm (in) Balancer unit: mm (in) Th ...

Other materials:

Throttle cable removal and installation
Removal Remove the air cleaner box. Refer to “air cleaner box removal and installation” .  Remove the right handlebar switch box. Refer to “handlebar removal and installation” in section 6b .  Remove the throttle cables as shown in the cable routing diagram. Refer to “thro ...

Isc valve reset
When removing or replacing the throttle body assembly, reset the isc valve learned value in the following procedures:  turn the ignition switch on position. Set up the sds tools. (Refer to the sds operation manual for further details.)  Click “active control”.  Click “is ...

Cooling system inspection
Inspect cooling system every 6 000 km (4 000 miles, 6 months) Replace engine coolant every 2 years Engine coolant level inspection Hold the motorcycle vertically.  Check the engine coolant level by observing the “f” and “l” lines on the engine coolant reservoir tank. If the level i ...

© 2011-2026 Copyright www.suzukigsxr.org