Tightening torque specifications
| Note the specified tightening torque is described in the following. “Body frame construction” “front footrest bracket construction” “side-stand construction” |
Reference
: for the tightening torque of fastener not specified in this section, refer to “tightening torque list” in section 0c .
Special tools and equipment
Recommended service material
| Note required service material is also described in the following. “Front footrest bracket construction” “side-stand construction” “pillion footrest construction” |
Side-stand removal and installationDTC “c31” (p0705): gp switch circuit
malfunction
Detected condition and possible cause
Detected condition
Possible cause
No gear position switch voltage
Gp switch voltage is not within the following range.
Gp switch voltage > 0.6 V
Gp switch circuit open or short.
Gp switch malfunction.
...
Front brake components
Seal set
Piston and seal set
Brake pad spring
Brake pad set
Front brake disc
7.5
N·m (0.75 Kgf-m, 5.5 Lbf-ft)
15 N·m (1.5
Kgf-m, 11.0 Lbf-ft)
39 N·m (3.9
Kgf-m, 28.0 Lbf-ft)
18 N·m (1.8
Kgf-m, 13.0 Lbf-ft)
Apply thread lo ...
Headlight removal and installation
Removal
Remove the body cowling assembly. Refer to “exterior parts removal and
installation” in section 9d .
Remove the air intake pipes (1). Refer to “exterior parts removal and
installation” in section 9d .
Remove the wiring harness no. 2 (2) By
disconnecting the couplers and ...