Tightening torque specifications

| Note the specified tightening torque is described in the following. “Rear view mirror construction” |
Reference
: for the tightening torque of fastener not specified in this section, refer to “tightening torque list” in section 0c .
Exterior parts removal and installation
Body structureTire pressure and loading
Proper tire pressure and proper
tire loading are important factors.
Overloading your tires can lead to
tire failure and loss of vehicle control.
Check tire pressure each day
before you ride, and be sure the
pressure is correct for the vehicle
load according to the table below.
Tire pre ...
Side-stand construction
Frame
Side-stand bracket
Washer
Side-stand
50 N·m (5.0 Kgf-m,
36.0 Lbf-ft)
40 N·m
(4.0 Kgf-m, 29.0 Lbf-ft)
Apply grease to sliding
surface.
...
Cooling system inspection
Inspect cooling system
every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
every 2 years
Engine coolant level inspection
Hold the motorcycle vertically.
Check the engine coolant level by observing the “f” and “l” lines on
the engine coolant reservoir tank. If the level i ...