Recommended service material

Note
required service material is also described in the following.
“Front wheel components” “front wheel assembly construction” “rear wheel components” “rear wheel assembly construction”
Special tool

Specifications
Driveline / axleCooling system inspection
Inspect cooling system
every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
every 2 years
Engine coolant level inspection
Hold the motorcycle vertically.
Check the engine coolant level by observing the “f” and “l” lines on
the engine coolant reservoir tank. If the level i ...
Drive chain related parts inspection
Refer to “rear sprocket / rear sprocket mounting drum removal and
installation” .
Dust seal
Inspect the dust seal for wear or damage. If any damage
is found, replace the dust seal with a new one.
Bearing
Inspect the play of the sprocket mounting drum bearing
by hand while it is in the dr ...
Front brake master cylinder components
Reservoir cap
Plate
Diaphragm
Reservoir tank
Master cylinder
Dust boot
Piston set
Brake lever
Brake lever pivot bolt
Brake lever pivot bolt lock-nut
Brake light switch
Brake hose union bolt
Brake hose
23 N·m (2.3 Kgf-m,
...