Recommended service material
Note required service material is also described in the following. “Front brake master cylinder components” “rear brake master cylinder components” “rear brake pedal construction” |
Special tool
Gearshift shaft / gearshift cam plate removal
and installation
Removal
Remove the engine sprocket cover. Refer to “engine sprocket removal and
installation” in section 3a .
Remove the clutch components. Refer to “clutch removal” in section 5c .
Remove the snap ring (1) and washer (2) from the
gearshift shaft.
Special tool
: 09900–06 ...
Headlight
To replace the headlight bulbs,
perform the following steps:
Upper light bulb
Remove the bolt 1 to lift the
instrument panel 2.
Turn the cap 3 counterclockwise
and remove it.
Unhook the bulb holder spring
4 and pull out the socket 5.
Pull off the bulb from ...
Tire inspection
Inspect tire
every 6 000 km (4 000 miles, 12 months)
Tire tread condition
Operating the motorcycle with excessively worn tires will
decrease riding stability and consequently invite a
dangerous situation. It is highly recommended to replace
a tire when the remaining depth of tire tread reaches ...