Service data
Fi sensors

Tightening torque specifications

Reference
: for the tightening torque of fastener not specified in this section, refer to “tightening torque list” in section 0c .
Isc valve preset and opening initialization
Special tools and equipmentIgnition switch inspection
Inspect the ignition switch in the following procedures:
remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect the ignition switch lead wire coupler (1).
Inspect the ignition switch for continuity with a tester.
If ...
Pair reed valve removal and installation
Removal
Lift and support the fuel tank with the prop stay.
Refer to “fuel tank removal and installation” in section 1g .
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Remove the pair control solenoid valve (1) along with the ...
Cushion lever removal and installation
Removal
Remove the right side cowling and side frame covers. Refer to “exterior
parts removal and installation” in section 9d .
Support the motorcycle with a jack to relieve load on
the cushion levers.
Remove the left muffler and muffler chamber heat guard no. 2. Refer to
...