Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Throttle cable play inspection and adjustment

Inspect throttle cable play initially at 1 000 km (600 miles, 2 months) and every 6 000 km (4 000 miles, 12 months) thereafter

Inspect and adjust the throttle cable play “a” as follows:

Throttle cable play “a” 2.0 – 4.0 Mm (0.08 – 0.16 In)

Suzuki GSX-R. Throttle cable play inspection and adjustment


  1. Remove the boot (1).
  2.  Loosen the lock-nut (2) of the throttle pulling cable.
  3.  Turn the adjuster (3) in or out until the throttle cable play “a” (at the throttle grip) is within 2 – 4 mm (0.08 – 0.16 In).
  4.  Tighten the lock-nut (2) while holding the adjuster (3).
  5.  Fit the boot (1) positively onto the adjuster.

Suzuki GSX-R. Throttle cable play inspection and adjustment


After the
adjustment is completed, check that handlebar movement does not raise the engine idle speed and that the throttle grip returns smoothly and automatically.
Engine oil and filter replacement
Replace engine oil initially at 1 000 km (600 miles, 2 months) and every 6 000 km (4 000 miles, 12 months) thereafter Replace oil filter initially at 1 000 km (600 miles, 2 months) and every 18 0 ...

Pair system inspection
Inspect pair system every 12 000 km (7 500 miles, 24 months) Inspect the pair (air supply) system periodically. Refer to “pair system inspection” in section 1b . Throttle valve synchronization ...

Other materials:

Evaporative emission control system diagram (only for e-33)
Fuel tank Fuel-vapor separator Fuel pump Fuel feed hose Fuel shut-off valve Iap sensor Surge hose Evap canister Purge hose Evap system purge control solenoid valve Fue Hc vapor Fresh air Vacuum ...

Cam chain tension adjuster inspection
The cam chain tension adjuster is maintained to proper tension automatically.  Remove the cam chain tension adjuster. Refer to “engine top side disassembly” .  Holding the cam chain tension adjuster as shown in the figure, compress the plunger by turning the adjuster body unt ...

Balancer shaft journal bearing removal and installation
Refer to “engine bottom side disassembly” (page 1d- 49). Refer to “engine bottom side assembly” . Removal Remove the balancer shaft journal bearings (1). Note  do not remove the bearings (1) unless absolutely necessary.  Make a note of where the bearings are r ...

© 2011-2025 Copyright www.suzukigsxr.org