Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Throttle cable play inspection and adjustment

Inspect throttle cable play initially at 1 000 km (600 miles, 2 months) and every 6 000 km (4 000 miles, 12 months) thereafter

Inspect and adjust the throttle cable play “a” as follows:

Throttle cable play “a” 2.0 – 4.0 Mm (0.08 – 0.16 In)

Suzuki GSX-R. Throttle cable play inspection and adjustment


  1. Remove the boot (1).
  2.  Loosen the lock-nut (2) of the throttle pulling cable.
  3.  Turn the adjuster (3) in or out until the throttle cable play “a” (at the throttle grip) is within 2 – 4 mm (0.08 – 0.16 In).
  4.  Tighten the lock-nut (2) while holding the adjuster (3).
  5.  Fit the boot (1) positively onto the adjuster.

Suzuki GSX-R. Throttle cable play inspection and adjustment


After the
adjustment is completed, check that handlebar movement does not raise the engine idle speed and that the throttle grip returns smoothly and automatically.
Engine oil and filter replacement
Replace engine oil initially at 1 000 km (600 miles, 2 months) and every 6 000 km (4 000 miles, 12 months) thereafter Replace oil filter initially at 1 000 km (600 miles, 2 months) and every 18 0 ...

Pair system inspection
Inspect pair system every 12 000 km (7 500 miles, 24 months) Inspect the pair (air supply) system periodically. Refer to “pair system inspection” in section 1b . Throttle valve synchronization ...

Other materials:

Radiator cap inspection
Inspect the radiator cap in the following procedures:  remove the radiator cap. Refer to “cooling circuit inspection” .  Attach the radiator cap (1) to the radiator tester (2) as shown. Slowly apply pressure to the radiator cap. If the radiator cap does not hold the pre ...

Fuel injection system description
Gsx-r1000 motorcycles are equipped with a fuel injection system for emission level control. This fuel injection system is precision designed, manufactured and adjusted to comply with the applicable emission limits. With varying engine conditions, all of the fuel injection volumes are precisely ...

Transmission removal
Remove the engine assembly from the frame. Refer to “engine assembly removal” in section 1d .  Remove the engine top side. Refer to “engine top side disassembly” in section 1d .  Separate the upper and lower crankcases. Refer to “engine bottom side disassembly” in section 1 ...

© 2011-2025 Copyright www.suzukigsxr.org