Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Front wheel assembly construction

Suzuki GSX-R. Front wheel assembly construction


  1. Brake disc bolt
  2. Brake caliper mounting bolt
  3. Front axle bolt
  4. Front axle pinch bolt
  5. Clearance
  6. 18 N·m (1.8 Kgf-m,
    13.0 Lbf-ft)
  7. 39 N·m
    (3.9 Kgf-m, 28.0 Lbf-ft)
  8. 100 N·m
    (10 kgf-m, 72.5 Lbf-ft)
  9. 23 N·m
    (2.3 Kgf-m, 16.5 Lbf-ft)

Apply grease.


Apply thread lock to the
thread part.

Front wheel components
Front axle Brake disc bolt Brake disc Dust seal Bearing Spacer Air valve Front wheel Wheel balancer Front tire Collar Front axle bolt ...

Front wheel assembly removal and installation
Removal Remove the brake calipers, left and right. Caution do not operate the brake lever with the caliper removed. Loosen two axle pinch bolts (1) on the right front ...

Other materials:

Rear sprocket / rear sprocket mounting drum removal and installation
Removal Remove the rear wheel assembly. Refer to “rear wheel assembly removal and installation” in section 2d .  Loosen the rear sprocket nuts.  Draw out the rear sprocket mounting drum (1) along with the rear sprocket (2) from the wheel hub.  Remove the rear sprocket n ...

Brake system inspection
Inspect brake system initially at 1 000 km (600 miles, 2 months) and every 6 000 km (4 000 miles, 12 months) thereafter Inspect brake hose and brake fluid every 6 000 km (4 000 miles, 12 months) The brake system of this motorcycle is filled with a glycol-based brake flui ...

Schematic and routing diagram
Engine lubrication system chart diagram Engine lubrication circuit diagram ...

© 2011-2026 Copyright www.suzukigsxr.org