Ignition system
Immobilizer description (for e-02, 19, 24, 51)Ignition switch inspection
Inspect the ignition switch in the following procedures:
remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect the ignition switch lead wire coupler (1).
Inspect the ignition switch for continuity with a tester.
If ...
Crankcase breather (pcv) hose / reed
valve / cover removal and installation
Removal
Lift and support the fuel tank with the prop stay.
Refer to “fuel tank removal and installation” in section 1g .
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect the crankcase breather (pcv) hose (1).
...
Engine oil level check
Check the engine oil level as follows:
Place the motorcycle on level
ground on the side stand.
Start the engine and allow it to
idle for a few minutes.
Stop the engine and wait three
minutes.
Hold the motorcycle vertically
and check the oil level through
...