Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Horn removal and installation

Removal

  1. Disconnect the horn coupler (1).
  2.  Remove the horn (2) by removing the mounting bolts.

Suzuki GSX-R. Horn removal and installation


Installation

Install the horn in the reverse order of removal.

Horn inspection
Note if the horn sound condition is normal, it is not necessary to inspect the horn button continuity. Horn button inspection Remove the air cleaner box. Refer to “air cleane ...

Specifications
Service data Wattage unit: w Tightening torque specifications Reference: for the tightening torque of fastener not specified in this section, refer to “tightening torque list” in section ...

Other materials:

Sprocket mounting drum dust seal / bearing removal and installation
Removal Remove the rear wheel assembly. Refer to “rear wheel assembly removal and installation” in section 2d .  Remove the rear sprocket mounting drum assembly (1). Refer to “rear sprocket / rear sprocket mounting drum removal and installation” (page 3a- 3). Remove the ...

Loading guidelines
This motorcycle is primarily intended to carry small items when you are not riding with a passenger. Follow the guidelines below to carry a passenger or cargo:  balance the load between the left and right side of the motorcycle and fasten it securely.  Place cargo weight as ...

Regulated voltage inspection
Inspect the regulated voltage in the following procedures:  remove the front seat. Refer to “exterior parts removal and installation” in section 9d (page 9d- 6).  Start the engine and keep it running at 5 000 r/min with the dimmer switch turned hi position. Measure the dc vo ...

© 2011-2026 Copyright www.suzukigsxr.org