|
|
Caution
|
Fuel system
General descriptionFront brake light switch inspection
Inspect the front brake light switch in the following
procedures:
disconnect the front brake light switch coupler (1).
Inspect the front brake light switch for continuity with
the tester.
If any abnormality is found, replace the front brake light switch with a new
one. Re ...
Piston and piston ring inspection
Refer to “piston ring removal and installation” .
Piston diameter
Measure the piston diameter using the micrometer at 15
mm (0.6 In) “a” from the skirt end. If the piston diameter
is less than the service limit, replace the piston.
Special tool
(a): 09900–20203 (micrometer (50 –
75 mm))
Pis ...