Refer to “electrical components location” in section 0a .
| Note make sure that the battery is fully charged. |
Before removing the turn signal/side-stand relay, check the operation of the turn signal light.
If the turn signal light does not illuminate, inspect the bulb, turn signal switch and circuit connection.
If the bulb, turn signal switch and circuit connection are ok, the turn signal relay may be faulty; therefore, replace the turn signal/side-stand relay with a new one.
Refer to “turn signal / side-stand relay removal and installation” .
Reflex reflector construction
Turn signal / side-stand relay removal and installationRiding on hills
When climbing steep hills, the
motorcycle may begin to slow
down and show lack of power.
At this point you should shift to
a lower gear so that the engine
will again be operating in its
normal power range. Shift rapidly
to prevent the motorcycle
from losing momentum.
When ...
Crankcase breather (pcv) cover inspection
Inspect the crankcase breather (pcv) cover in the
following procedures:
remove the crankcase breather (pcv) cover. Refer to “crankcase breather
(pcv) hose / reed valve / cover removal and installation” .
Inspect the crankcase breather (pcv) cover for
carbon deposit. If carbon ...
Front brake hose routing diagram
Hose clamp
: clamp end should face downward.
Stopper
: after the brake hose union has contacted to the stopper, tighten
the union bolt.
Hose guide
: pass the brake hose through the hose guide.
Stopper
: after positioning the clamp with the stopper ...