Removal

Installation
Install the turn signal/side-stand relay in the reverse order of removal.
Turn signal / side-stand relay inspection
Hazard switch inspectionWater hose removal and installation
Removal
Remove the side cowlings. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Drain engine coolant. Refer to “cooling system inspection” in section
0b .
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in se ...
Fuel injection system description
Gsx-r1000 motorcycles are equipped with a fuel injection system for emission
level control. This fuel injection system
is precision designed, manufactured and adjusted to comply with the applicable
emission limits. With varying engine
conditions, all of the fuel injection volumes are precisely ...
Chassis bolt and nut inspection
Tighten chassis bolt and nut
initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Check that all chassis bolts and nuts are tightened to
their specified torque.
Steering stem
lock-nut 80 n·m (8.0 Kgf-m, 58.0 Lbf-ft)
Stee ...