| Caution when you touch the bulb with your bare hands, clean the bulb with a cloth moistened with alcohol or soap water to prevent premature bulb failure. |


Rear turn signal light removal and installation
Reflex reflector constructionDrive chain inspection and adjustment
Inspect drive chain
initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Drive chain visual check
With the transmission in neutral, support the
motorcycle using a jack and turn the rear wheel
slowly by hand.
Visually check the drive chain fo ...
Special tools and equipment
Recommended service material
Note
required service material is also described in the following.
“Transmission components” “gearshift lever construction”
“gearshift shaft / gearshift cam plate components” “gearshift
shaft construction”
Special to ...
Crankcase breather (pcv) hose / reed
valve / cover removal and installation
Removal
Lift and support the fuel tank with the prop stay.
Refer to “fuel tank removal and installation” in section 1g .
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect the crankcase breather (pcv) hose (1).
...