Recommended service material

| Note required service material is also described in the following. “Rear brake components” |
Special tool

SpecificationsStv actuator removal and installation
Refer to “throttle body disassembly and assembly” in section 1d .
Caution
never remove the stva from the throttle
body.
Isc valve inspection
Refer to “dtc “c40” (p0505 / p0506 / p0507): isc valve circuit malfunction”
in section 1a .
Isc valve removal and installation
Refer t ...
Cooling system inspection
Inspect cooling system
every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
every 2 years
Engine coolant level inspection
Hold the motorcycle vertically.
Check the engine coolant level by observing the “f” and “l” lines on
the engine coolant reservoir tank. If the level i ...
Specifications
Service data
Valve + guide
unit: mm (in)
Camshaft + cylinder head
unit: mm (in)
Cylinder + piston + piston ring
unit: mm (in)
Conrod + crankshaft
unit: mm (in)
Balancer
unit: mm (in)
Oil pump
Clutch
unit: mm (in)
Drive train
unit: mm (in) except ratio
...