Recommended service material

| Note required service material is also described in the following. “Rear brake components” |
Special tool

SpecificationsFuel pump disassembly and assembly
Disassembly
Remove the fuel tank. Refer to “fuel tank removal and installation” .
Remove the fuel pump assembly (1) by removing its
mounting bolts diagonally.
Spilled gasoline should be wipe off
immediately.
Keep away from fire or spark.
Work in a wel ...
Clutch cable play inspection and adjustment
Inspect clutch cable play
every 6 000 km (4 000 miles, 12 months)
Inspect and adjust the clutch cable play “a” as follows.
Clutch cable play “a”
10 – 15 mm (0.4 – 0.6 In)
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
  ...
Throtile cable play
This motorcycle has a twin throttle
cable system. Cable A is for pulling
cable and cable B is for
returning.
To adjust the cable play:
Loosen the lock nut 1.
Turn the adjuster 2 so that the
throttle grip has 2.0 - 4.0 Mm
(0.08- 0.16 In) play.Tighten the lock nut 1.
...