Tightening torque specifications
| Note the specified tightening torque is described in the following. “Body frame construction” “front footrest bracket construction” “side-stand construction” |
Reference
: for the tightening torque of fastener not specified in this section, refer to “tightening torque list” in section 0c .
Special tools and equipment
Recommended service material
| Note required service material is also described in the following. “Front footrest bracket construction” “side-stand construction” “pillion footrest construction” |
Side-stand removal and installationPair system inspection
Inspect pair system
every 12 000 km (7 500 miles, 24 months)
Inspect the pair (air supply) system periodically. Refer to “pair system
inspection” in section 1b .
Throttle valve synchronization
Inspect throttle valve synchronization
initially at 1 000 km (600 miles, 2 months) (e-33 only)
and ...
Fuel pump relay inspection
Refer to “electrical components location” in section 0a .
Inspect the fuel pump relay in the following procedures:
remove the frame covers. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Remove the fuel pump relay (1).
First, check f ...
Handlebar components
Throttle grip
Grip rubber
Right handlebar switch box
Left handlebar switch box
Right handlebar
Left handlebar
Handlebar expander
Handlebar balancer
Apply handle grip bond.
23
N·m (2.3 Kgf-m, 16.5 Lbf-ft)
5.5 N·m
(0.55 Kgf-m, 4.0 L ...