Tightening torque specifications
| Note the specified tightening torque is described in the following. “Body frame construction” “front footrest bracket construction” “side-stand construction” |
Reference
: for the tightening torque of fastener not specified in this section, refer to “tightening torque list” in section 0c .
Special tools and equipment
Recommended service material
| Note required service material is also described in the following. “Front footrest bracket construction” “side-stand construction” “pillion footrest construction” |
Side-stand removal and installationBreak-in
The first 800 km (500 miles) is the
most important in the life of your
motorcycle. Proper operation during
this break-in period will help
assure maximum life and performance
from your new motorcycle.
The following guidelines explain
proper break-in procedures.
Maximum engine speed recommen ...
Drive chain cleaning and lubricating
Clean and lubricate drive chain
every 1 000 km (600 miles)
Clean and lubricate the drive chain in the following
procedures:
clean the drive chain with kerosine. If the drive chain
tends to rust quickly, the intervals must be
shortened.
Caution
do not use trichloroethyle ...
Sprocket mounting drum dust seal / bearing removal and installation
Removal
Remove the rear wheel assembly. Refer to “rear wheel assembly removal
and installation” in section 2d .
Remove the rear sprocket mounting drum assembly
(1). Refer to “rear sprocket / rear sprocket
mounting drum removal and installation” (page 3a-
3).
Remove the ...