Removal
Caution
|
Installation
Install the side-stand as shown in the side-stand construction. Refer to “side-stand construction” .
Pillion footrest construction
SpecificationsConrod crank pin bearing inspection and
selection
Refer to “engine bottom side disassembly” (page 1d-
49).
Refer to “engine bottom side assembly” .
Inspection
Inspect the bearing surfaces for any signs of fusion,
pitting, burn or flaws. If any, replace them with a
specified set of bearings.
Place the plastigauge axially along ...
Regulator / rectifier construction
Regulator/rectifier
Regulator/rectifier bracket
Air intake pipe (rh)
Spacer
Wiring harness
Connect
the regulator/rectifier couplers under the wiring harness
10
N·m (1.0 Kgf-m, 7.0 Lbf-ft)
...
Spark plugs
Your motorcycle comes equipped
with ngk cr9e or denso
u27esr-n spark plugs. To determine
if the standard spark plug is
right for your usage, check the
color of the plug's porcelain center
electrode insulator after motorcycle
operation. A light brown
color indicates that the plug is correct.
...