
|
Side-stand construction
Side-stand removal and installationHeadlight beam adjustment
Adjust the headlight beam, both horizontally and
vertically.
Note
to adjust the headlight beam, adjust the
beam horizontally first, then vertically.
It is not necessary to remove the
combination meter to turn the adjusters.
Horiz ...
Cooling system inspection
Inspect cooling system
every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
every 2 years
Engine coolant level inspection
Hold the motorcycle vertically.
Check the engine coolant level by observing the “f” and “l” lines on
the engine coolant reservoir tank. If the level i ...
Transmission removal
Remove the engine assembly from the frame. Refer to “engine assembly
removal” in section 1d .
Remove the engine top side. Refer to “engine top side disassembly” in
section 1d .
Separate the upper and lower crankcases. Refer to “engine bottom side
disassembly” in section 1 ...