Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Combination meter disassembly and assembly

Refer to “combination meter removal and installation” .

Disassembly disassemble the combination meter as shown in the combination meter components. Refer to “combination meter components” .

Assembly assemble the combination meter as shown in the combination meter components. Refer to “combination meter components” .

Combination meter removal and installation
Removal Remove the combination meter mounting bolt (1). Bushing Disconnect the coupler (2) and remove the combination meter assembly (3). Installat ...

Combination meter inspection
Led inspection Check that the leds “a” (fi, fuel, engine rpm, oil pressure/engine coolant, immobilizer (e-02, 19, 24, 51) and meter panel illumination) immediately light up when the ignition switc ...

Other materials:

Engine sprocket removal and installation
Removal Remove the gearshift link arm (1) from the gearshift shaft. Note mark the gearshift shaft head at which the gearshift link arm slit set for correct reinstallation. Remove the speed sensor (2). Remove the engine sprocket cover (3). Support the ...

Starter motor components
O-ring Housing end (inside) O-ring Starter motor case Armature Housing end (outside) 10 N·m (1.0 Kgf-m, 7.0 Lbf-ft) 4 N·m (0.4 Kgf-m, 3.0 Lbf-ft) 5 N·m (0.5 Kgf-m, 3.5 Lbf-ft) Apply grease to sliding surface Apply moly ...

Isc valve preset and opening initialization
When removing or replacing the isc valve, set the isc valve to the following procedures:  turn the ignition switch on.  Set up the sds tool. (Refer to the sds operation manual for further details.)  Click the “active control”.  Click the “isc learned value reset” (1) ...

© 2011-2025 Copyright www.suzukigsxr.org