Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Combination meter disassembly and assembly

Refer to “combination meter removal and installation” .

Disassembly disassemble the combination meter as shown in the combination meter components. Refer to “combination meter components” .

Assembly assemble the combination meter as shown in the combination meter components. Refer to “combination meter components” .

Combination meter removal and installation
Removal Remove the combination meter mounting bolt (1). Bushing Disconnect the coupler (2) and remove the combination meter assembly (3). Installat ...

Combination meter inspection
Led inspection Check that the leds “a” (fi, fuel, engine rpm, oil pressure/engine coolant, immobilizer (e-02, 19, 24, 51) and meter panel illumination) immediately light up when the ignition switc ...

Other materials:

Oil pan / oil pressure regulator / oil strainer removal and installation
Note the oil pan/oil strainer/oil pressure regulator cannot be serviced with the engine installed in the frame. Removal Remove the engine assembly from the frame. Refer to “engine assembly removal” in section 1d .  Remove the plate (1).  Remove the oil pan ...

Rear wheel dust seal / bearing removal and installation
Removal Remove the rear wheel assembly. Refer to “rear wheel assembly removal and installation” .  Remove the rear sprocket mounting drum assembly (1) from the rear wheel. Remove the wheel dampers (2). Remove the dust seal. Special tool (a): 09913–50121 (oil s ...

Spring pre-load adjustment
To change the spring pre-load, turn the adjuster 1 clockwise or counterclockwise. Turning the adjuster clockwise will increase the spring pre-load. Turning the adjuster counterclockwise will decrease the spring pre-load. There are five grooved lines on the side of the adjuster 1 for re ...

© 2011-2026 Copyright www.suzukigsxr.org