Special tools and equipment
General descriptionBalancer shaft journal bearing removal and
installation
Refer to “engine bottom side disassembly” (page 1d-
49).
Refer to “engine bottom side assembly” .
Removal
Remove the balancer shaft journal bearings (1).
Note
do not remove the bearings (1) unless
absolutely necessary.
Make a note of where the bearings are
r ...
Brake system inspection
Inspect brake system
initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Inspect brake hose and brake fluid
every 6 000 km (4 000 miles, 12 months)
The brake system of this motorcycle is
filled with a glycol-based brake flui ...
Throttle valve synchronization
Check and adjust the throttle valve synchronization
among four cylinders.
Start the engine and run it in idling condition
for
warming up.
Stop the warmed-up engine.
Lift and support the fuel tank. Refer to “fuel
tank
removal and installation” in section 1g (page ...