Recommended service material

| Note required service material is also described in the following. “Rear lighting system construction” |
Special tool

SpecificationsBattery charging
Initial charging
filling electrolyte
Note
when filling electrolyte, the battery must be
removed from the vehicle and must be put on
the level ground.
Remove the aluminum tape (1) which seals the
battery filler holes “a”.
Remove the caps (2) from the electrolyte ...
Regulated voltage inspection
Inspect the regulated voltage in the following
procedures:
remove the front seat. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Start the engine and keep it running at 5 000 r/min
with the dimmer switch turned hi position.
Measure the dc vo ...
Cam chain tensioner inspection
Inspect the cam chain tensioner in the following
procedures:
remove the cam chain tensioner. Refer to “cam chain guide / cam chain
tensioner removal and installation” .
Check the contacting surface of the cam chain
tensioner. If it is worn or damaged, replace it with a
new ...