Recommended service material

| Note required service material is also described in the following. “Rear lighting system construction” |
Special tool

SpecificationsCooling system inspection
Inspect cooling system
every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
every 2 years
Engine coolant level inspection
Hold the motorcycle vertically.
Check the engine coolant level by observing the “f” and “l” lines on
the engine coolant reservoir tank. If the level i ...
Rear brake light switch inspection
Inspect the rear brake light switch in the following
procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Disconnect the rear brake light switch lead wire
coupler (1).
Inspect the rear brake light swi ...
Evaporative emission control system
diagram (only for e-33)
Fuel tank
Fuel-vapor separator
Fuel pump
Fuel feed hose
Fuel shut-off valve
Iap sensor
Surge hose
Evap canister
Purge hose
Evap system purge control solenoid valve
Fue
Hc vapor
Fresh air
Vacuum
...