SpecificationsStarter motor removal and installation
Removal
Turn the ignition switch off and disconnect the
battery (–) lead wire (1).
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Disconnect the starter motor lead wire (2).
Remove the starter motor (3).
...
Engine coolant solution
Use engine coolant that is com·
patible with an aluminum radiator,
mixed with distilled water at a
50:50 mixture ratio for engine
coolant solution. An engine coolant
mixture other than 50:50 can
affect cooling efficiency or rust
inhibiting performance.
Engine coolant
Engine coolant should b ...
Valve clearance inspection and adjustment
Inspect valve clearance
initially every 24 000 km (14 500 miles, 48 months)
Inspection
Valve clearance adjustment must be checked and
adjusted, a) at the time of periodic inspection, b) when
the valve mechanism is serviced, and c) when the
camshafts are removed for servicing.
Lift an ...