Inspect the exhaust pipe, muffler chamber and muffler connection for exhaust gas leakage and mounting condition. If any defect is found, replace the exhaust pipe, muffler chamber or muffler with a new one.
Check the exhaust pipe bolts, muffler connecting bolts and muffler mounting bolts are tightened to their specified torque. Refer to “exhaust system components” .
Muffler / muffler chamber / exhaust pipe
removal and installation
SpecificationsDamping force adjustment
The rebound and compression
damping force can be individually
adjusted by turning the respective
adjusters. The rebound damping
force adjuster 1 is located at the
bottom of the rear suspension.
The compression damping force
adjuster 2 is located at the left
side of the motorcycle.
To ad ...
Rear wheel components
Rear axel nut
Collar
Dust seal
Bearing
Retainer
Rear sprocket
Sprocket mounting drum
Wheel damper
Bearing
Spacer
Air valve
Rear wheel
Wheel balancer
Rear tire
Dust seal
Collar
Rear brake disc
Rear axle
1 ...
Clutch cable play inspection and adjustment
Inspect clutch cable play
every 6 000 km (4 000 miles, 12 months)
Inspect and adjust the clutch cable play “a” as follows.
Clutch cable play “a”
10 – 15 mm (0.4 – 0.6 In)
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
  ...