Removal

Installation
Install the horn in the reverse order of removal.
Horn inspection
SpecificationsCooling system inspection
Inspect cooling system
every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
every 2 years
Engine coolant level inspection
Hold the motorcycle vertically.
Check the engine coolant level by observing the “f” and “l” lines on
the engine coolant reservoir tank. If the level i ...
Regulator / rectifier inspection
Inspect the regulator/rectifier in the following procedures:
turn the ignition switch off.
Disconnect the regulator/rectifier couplers. Refer to “regulator /
rectifier removal and installation” .
Measure the voltage between the terminals using the multi-circuit
tester ...
Gear position (gp) switch removal and installation
Removal
Turn the ignition switch off.
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Disconnect the gear position switch lead wire
coupler (1).
Remove the engine sprocket cover. Refer to “engine sprocket r ...