| Note be careful not to drop any parts into the crankcase. |
Removal



Installation
| Caution use a new o-ring to prevent oil leakage. |
: Grease 99000–25010 (suzuki
super
grease “a” or equivalent)

| Note engage the oil pump shaft end with the water pump shaft slot. |

Tightening torque oil pump mounting bolt (a): 10 n·m (1.0 Kgf-m, 7.0 Lbf-ft)

: Thread lock cement
99000–32110
(thread lock cement super “1322” or
equivalent)
Tightening torque oil pump driven sprocket bolt (b): 10 n·m (1.0 Kgf-m, 7.0 Lbf-ft)

Oil jet inspection
Oil pump inspectionWiring diagram
Refer to “wire color symbols” in section 0a .
For e-02, 19, 24, 51
For e-03, 28
For e-14, 33
...
Engine top side assembly
Assemble the engine top side in the reverse order of
disassembly. Pay attention to the following points:
Cylinder head
Install the dowel pins and a new cylinder head gasket
(1) to the cylinder.
Caution
use a new gasket to prevent gas leakage.
Place the cylinder head ...
Battery visual inspection
Inspect the battery in the following procedures:
remove the front seat. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Visually inspect the surface of the battery container.
If any signs of cracking or electrolyte leakage from
the sides of th ...