Recommended service material

| Note required service material is also described in the following. “Transmission components” “gearshift lever construction” “gearshift shaft / gearshift cam plate components” “gearshift shaft construction” |
Special tool

Specifications
ClutchCrankshaft journal bearing inspection and
selection
Refer to “engine bottom side disassembly” (page 1d-
49).
Refer to “engine bottom side assembly” .
Inspection
Inspect each upper and lower crankcase bearing for
any damage.
Set the crankshaft onto the upper crank case.
Install the plastigauge onto each crankshaft jour ...
Regulator / rectifier inspection
Inspect the regulator/rectifier in the following procedures:
turn the ignition switch off.
Disconnect the regulator/rectifier couplers. Refer to “regulator /
rectifier removal and installation” .
Measure the voltage between the terminals using the multi-circuit
tester ...
Wiring harness routing diagram
Wiring harness no. 2
Tapping clamp
: insert the clamp from the front side. Place the turn signal
and position light couplers in front of the clamp.
Steel clamp
: clamp the wiring harness at the blue taping point. Bend
the steel clamps to the front side.
...