Precautions
Diagnostic information and proceduresWater hose removal and installation
Removal
Remove the side cowlings. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Drain engine coolant. Refer to “cooling system inspection” in section
0b .
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in se ...
Brake system inspection
Inspect brake system
initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Inspect brake hose and brake fluid
every 6 000 km (4 000 miles, 12 months)
The brake system of this motorcycle is
filled with a glycol-based brake flui ...
Throttle body construction
Intake pipe
Evap system purge control solenoid valve
(e-33 only)
Evap canister (e-33 only)
Iat sensor
Isc valve hose
Ho2 sensor
Face
the clamp end left side.
Yellow
marking should face upward.
Face the
end of clamps upward and ke ...