Engine oil and filter replacement
Refer to “engine oil and filter replacement” in section 0b .
Engine oil level inspection
Refer to “engine oil and filter replacement” in section 0b .
Break-in procedures
During manufacture only the best possible materials are
used and all machined parts are finished to a very high
standard but it is still necessary to allow the moving parts
to “break-in” before subjecting the engine to maximum
stresses. The future performance and reliability of the
engine depen ...
Starter clutch inspection
Refer to “starter clutch removal and installation” .
Starter clutch
Install the starter driven gear onto the starter clutch.
Turn the starter driven gear by hand to inspect the
starter clutch for a smooth movement. The gear
turns in one direction only. If a large resistance is felt
...
Ignition coil and spark plug removal and
installation
Removal
The hot
engine can burn you.
Wait until the engine is cool enough to touch.
Turn the ignition switch off.
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect the lead wire couplers (1).
...