Refer to “oil jet removal and installation” .
Oil jet
Make sure that the oil jets are not clogged. If they are clogged, clean their oil passage using a wire of the proper size and compressed air.
|
Water pump construction
Impeller
Mechanical seal
Oil seal
O-ring
O-ring
8
N·m (0.8 Kgf-m, 6.0 Lbf-ft)
10 N·m
(1.0 Kgf-m, 7.0 Lbf-ft)
Apply grease.
Apply engine coolant.
Apply molybdenum oil
solution.
Do not reuse.
...
Rear suspension inspection
Inspect rear suspension
every 12 000 km (7 500 miles, 24 months)
Inspect the rear shock absorber for oil leakage and
check that there is no play in the swingarm.
Replace any defective parts, if necessary. Refer to “rear shock absorber removal
and installation” in section 2c , “cushion lever ...
Lubrication points
Proper lubrication is important for smooth operation and long life of each
working part of the motorcycle.
Major lubrication points are indicated as follows.
Note
before lubricating each part, clean off any rusty spots
and wipe off any grease, oil, dirt or grime.
&nbs ...