Recommended service material

| Note required service material is also described in the following. “Starter motor components” |
Special tool

Specifications
Charging systemLubrication points
Proper lubrication is important for smooth operation and long life of each
working part of the motorcycle.
Major lubrication points are indicated as follows.
Note
before lubricating each part, clean off any rusty spots
and wipe off any grease, oil, dirt or grime.
&nbs ...
Valve clearance inspection and adjustment
Inspect valve clearance
initially every 24 000 km (14 500 miles, 48 months)
Inspection
Valve clearance adjustment must be checked and
adjusted, a) at the time of periodic inspection, b) when
the valve mechanism is serviced, and c) when the
camshafts are removed for servicing.
Lift an ...
Throttle body construction
Intake pipe
Evap system purge control solenoid valve
(e-33 only)
Evap canister (e-33 only)
Iat sensor
Isc valve hose
Ho2 sensor
Face
the clamp end left side.
Yellow
marking should face upward.
Face the
end of clamps upward and ke ...