Special tools and equipment
Schematic and routing diagramEngine coolant
Coolant level
The engine coolant solution
should be between "f" (full) and
"1..:' (Low) level lines on the engine
coolant reservoir. If the level is
lower than "1..:' (Low) level line,
bring it up to "f" (full) level by adding
50:50 mixture of distilled water ...
Valve clearance inspection and adjustment
Inspect valve clearance
initially every 24 000 km (14 500 miles, 48 months)
Inspection
Valve clearance adjustment must be checked and
adjusted, a) at the time of periodic inspection, b) when
the valve mechanism is serviced, and c) when the
camshafts are removed for servicing.
Lift an ...
Muffler / muffler chamber / exhaust pipe
removal and installation
Removal
Loosen the muffler connecting bolts (1).
Remove the mufflers (2) by removing the mounting
bolt and nut (3).
Note
support the muffler to prevent it from falling.
Remove the side cowlings. Refer to “exterior parts
removal and installation” in secti ...