Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Specifications

Service data

Drive train unit: mm (in) except ratio

Suzuki GSX-R. Service data


Tightening torque specifications

Suzuki GSX-R. Tightening torque specifications


Note

the specified tightening torque is described in the following.

“Drive chain related components”

Reference

: for the tightening torque of fastener not specified in this section, refer to “tightening torque list” in section 0c .Reference: for the tightening torque of fastener not specified in this section, refer to “tightening torque list” in section 0c .

Drive chain replacement
Use the special tool in the following procedures, to cut and rejoin the drive chain. Note when using the special tool, apply a small quantity of grease to the threaded parts of the s ...

Special tools and equipment
Recommended service material Note required service material is also described in the following. “Drive chain related components” Special tool ...

Other materials:

Rear wheel assembly construction
Rear sprocket nut Rear axle nut Brake disc bolt Clearance 60 N·m (6.0 Kgf-m, 43.0 Lbf-ft) 100 N·m (10 kgf-m, 72.5 Lbf-ft) 35 N·m (3.5 Kgf-m, 25.5 Lbf-ft) Apply grease. Apply thread lock to the thread part. ...

Rear brake hose removal and installation
Removal Drain brake fluid. Refer to “brake fluid replacement” .  Remove the rear brake hoses as shown in the rear brake hose routing diagram. Refer to “rear brake hose routing diagram” . Installation Caution the seal washers should be replaced with new ones to prevent ...

Crankcase breather (pcv) hose / reed valve / cover removal and installation
Removal Lift and support the fuel tank with the prop stay. Refer to “fuel tank removal and installation” in section 1g .  Remove the air cleaner box. Refer to “air cleaner box removal and installation” in section 1d .  Disconnect the crankcase breather (pcv) hose (1). ...

© 2011-2026 Copyright www.suzukigsxr.org