
|
Exterior parts construction
Frame cover constructionEngine top side assembly
Assemble the engine top side in the reverse order of
disassembly. Pay attention to the following points:
Cylinder head
Install the dowel pins and a new cylinder head gasket
(1) to the cylinder.
Caution
use a new gasket to prevent gas leakage.
Place the cylinder head ...
Piston and piston ring inspection
Refer to “piston ring removal and installation” .
Piston diameter
Measure the piston diameter using the micrometer at 15
mm (0.6 In) “a” from the skirt end. If the piston diameter
is less than the service limit, replace the piston.
Special tool
(a): 09900–20203 (micrometer (50 –
75 mm))
Pis ...
Excva pulley inspection
Inspect the excva pulley in the following procedures:
remove the excva pulley. Refer to “excv cable removal and installation”
.
Visually inspect the excva pulley for wear and
damage. If there is anything unusual, replace the
pulley with a new one.
Install the pulle ...