
|
Exterior parts construction
Frame cover constructionSpecifications
Service data
Electrical
unit: mm
Caution
never use anything except the specified battery.
Tightening torque specifications
Note
the specified tightening torque is described in the following.
“Regulator / rectifier construction”
Reference: for the tig ...
Evaporative emission control system
inspection (only for e-33)
Refer to “evaporative emission control system removal and installation (only
for e-33)” .
Hose
Inspect the hoses for wear or damage. If it is worn or
damage, replace the hose with a new one.
Note
make sure that the hoses are securely
connected.
Evap canister
Inspect the eva ...
Front brake master cylinder components
Reservoir cap
Plate
Diaphragm
Reservoir tank
Master cylinder
Dust boot
Piston set
Brake lever
Brake lever pivot bolt
Brake lever pivot bolt lock-nut
Brake light switch
Brake hose union bolt
Brake hose
23 N·m (2.3 Kgf-m,
...