
|
Exterior parts construction
Frame cover constructionRear brake light switch inspection
Inspect the rear brake light switch in the following
procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Disconnect the rear brake light switch lead wire
coupler (1).
Inspect the rear brake light swi ...
Chassis bolt and nut inspection
Tighten chassis bolt and nut
initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Check that all chassis bolts and nuts are tightened to
their specified torque.
Steering stem
lock-nut 80 n·m (8.0 Kgf-m, 58.0 Lbf-ft)
Stee ...
Idle speed
Adjust the engine idle speed periodically on the engine at normal operating
temperature.
To adjust the idle speed:
Lift the fuel tank by referring to
the air cleaner section.
Start the engine and warm it
up by running at idling speed
for 10 minutes in summer
(where ambie ...