
|
Exterior parts construction
Frame cover constructionOil jet removal and installation
Piston cooling oil jet
Removal
Remove the engine assembly. Refer to “engine assembly removal” in
section 1d .
Remove the crankshaft assembly. Refer to “engine
bottom side disassembly” in section 1d (page 1d-
49).
Remove the piston cooling oil jets (1) from the upper
cra ...
Starter motor disassembly and assembly
Refer to “starter motor removal and installation” .
Disassembly
Disassemble the starter motor as shown in the starter motor components
diagram. Refer to “starter motor components” .
Assembly
Reassemble the starter motor in the reverse order of
removal. Pay attention to the following points:
...
Throttle cable play inspection and adjustment
Inspect throttle cable play
initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Inspect and adjust the throttle cable play “a” as follows:
Throttle cable play “a”
2.0 – 4.0 Mm (0.08 – 0.16 In)
Remove the boot (1).
Loosen the lock-nu ...