Special tools and equipmentPair control solenoid valve removal and
installation
Removal
Lift and support the fuel tank with the prop stay.
Refer to “fuel tank removal and installation” in section 1g .
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Remove the pair control solenoid valve (1) along
with the pair ...
Special tools and equipment
Recommended service material
Note
required service material is also described in the following.
“Front wheel components” “front wheel assembly construction” “rear
wheel components” “rear wheel assembly construction”
Special tool
...
Drive chain cleaning and lubricating
Clean and lubricate drive chain
every 1 000 km (600 miles)
Clean and lubricate the drive chain in the following
procedures:
clean the drive chain with kerosine. If the drive chain
tends to rust quickly, the intervals must be
shortened.
Caution
do not use trichloroethyle ...