Special tool


Specifications
Emission control devicesIgnition switch removal and installation
Removal
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect the ignition switch lead wire coupler (1).
Disconnect the immobilizer lead wire coupler (2).
(For e-02, 19, 24, 51)
Remove the harness clamp (3).
...
Engine oil level check
Check the engine oil level as follows:
Place the motorcycle on level
ground on the side stand.
Start the engine and allow it to
idle for a few minutes.
Stop the engine and wait three
minutes.
Hold the motorcycle vertically
and check the oil level through
...
Rear shock absorber adjustment
After installing the rear suspension, adjust the spring
pre-load and damping force as follows:
Spring pre-load adjustment
The set length 179.3 Mm (7.06 In) provides the
maximum spring pre-load.
The set length 189.3 Mm (7.45 In) provides the
minimum spring pre-load.
Std position
184.3 ...