Schematic and routing diagram
Charging system symptom diagnosisRear turn signal light removal and installation
Removal
Remove the frame cover assembly. Refer to “exterior parts removal and
installation” in section 9d .
Remove the rear combination light. Refer to “rear combination light
removal and installation” .
Disconnect the lead wire coupler (1).
(Lh: white, rh: black)
&nb ...
Brake system inspection
Inspect brake system
initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Inspect brake hose and brake fluid
every 6 000 km (4 000 miles, 12 months)
The brake system of this motorcycle is
filled with a glycol-based brake flui ...
Ckp sensor removal and installation
Removal
Remove the clutch cover. Refer to “clutch removal” in section 5c .
Remove the ckp sensor (1).
Installation
Install the ckp sensor in the reverse order of removal.
Refer to “clutch installation” in section 5c .
Iap sensor inspection
Refer to “dtc “c13” (p0105-h/l): ia ...