Schematic and routing diagram
Charging system symptom diagnosisEngine top side assembly
Assemble the engine top side in the reverse order of
disassembly. Pay attention to the following points:
Cylinder head
Install the dowel pins and a new cylinder head gasket
(1) to the cylinder.
Caution
use a new gasket to prevent gas leakage.
Place the cylinder head ...
Throttle body components
Fuel delivery pipe
Fuel delivery pipe t-joint
O-ring
Tp sensor
Stp sensor
Secondary fuel injector
Primary fuel injector
Cushion seal
Isc valve
Air screw
Vacuum hose
Evap system purge control solenoid valve
For e-33 only
3.5
...
Excva adjustment
Inspect the excva operation and adjust it if necessary
in the following steps:
Step 1
Set the excva to the adjustment position. Refer to
“excv cable removal and installation” (page 1k-
6).
Step 2
Turn the ignition switch off.
Turn the mode select switch off.
Turn the ...