Emission control devices
Fuel injection system descriptionRear turn signal light removal and installation
Removal
Remove the frame cover assembly. Refer to “exterior parts removal and
installation” in section 9d .
Remove the rear combination light. Refer to “rear combination light
removal and installation” .
Disconnect the lead wire coupler (1).
(Lh: white, rh: black)
&nb ...
Cushion lever removal and installation
Removal
Remove the right side cowling and side frame covers. Refer to “exterior
parts removal and installation” in section 9d .
Support the motorcycle with a jack to relieve load on
the cushion levers.
Remove the left muffler and muffler chamber heat guard no. 2. Refer to
...
Evaporative emission control system
diagram (only for e-33)
Fuel tank
Fuel-vapor separator
Fuel pump
Fuel feed hose
Fuel shut-off valve
Iap sensor
Surge hose
Evap canister
Purge hose
Evap system purge control solenoid valve
Fue
Hc vapor
Fresh air
Vacuum
...