
|
Headlight removal and installationThrottle valve synchronization
Check and adjust the throttle valve synchronization
among four cylinders.
Start the engine and run it in idling condition
for
warming up.
Stop the warmed-up engine.
Lift and support the fuel tank. Refer to “fuel
tank
removal and installation” in section 1g (page ...
Engine sprocket removal and installation
Removal
Remove the gearshift link arm (1) from the gearshift
shaft.
Note
mark the gearshift shaft head at which the
gearshift link arm slit set for correct
reinstallation.
Remove the speed sensor (2).
Remove the engine sprocket cover (3).
Support the ...
DTC “c31” (p0705): gp switch circuit
malfunction
Detected condition and possible cause
Detected condition
Possible cause
No gear position switch voltage
Gp switch voltage is not within the following range.
Gp switch voltage > 0.6 V
Gp switch circuit open or short.
Gp switch malfunction.
...