Rear brake pedal
Front seatExcva pulley inspection
Inspect the excva pulley in the following procedures:
remove the excva pulley. Refer to “excv cable removal and installation”
.
Visually inspect the excva pulley for wear and
damage. If there is anything unusual, replace the
pulley with a new one.
Install the pulle ...
Cooling system inspection
Inspect cooling system
every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
every 2 years
Engine coolant level inspection
Hold the motorcycle vertically.
Check the engine coolant level by observing the “f” and “l” lines on
the engine coolant reservoir tank. If the level i ...
Steering tension adjustment
Check the steering movement in the following
procedures:
by supporting the motorcycle with a jack, lift the front
wheel unit is off the floor 20 – 30 mm (0.8 – 1.2 In).
Remove the steering damper. Refer to “steering damper construction” .
Check to make sure that the cabl ...