Service data
Fi sensors

Tightening torque specifications

Reference
: for the tightening torque of fastener not specified in this section, refer to “tightening torque list” in section 0c .
Isc valve preset and opening initialization
Special tools and equipmentRegulated voltage inspection
Inspect the regulated voltage in the following
procedures:
remove the front seat. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Start the engine and keep it running at 5 000 r/min
with the dimmer switch turned hi position.
Measure the dc vo ...
Throttle body components
Fuel delivery pipe
Fuel delivery pipe t-joint
O-ring
Tp sensor
Stp sensor
Secondary fuel injector
Primary fuel injector
Cushion seal
Isc valve
Air screw
Vacuum hose
Evap system purge control solenoid valve
For e-33 only
3.5
...
Fuel line inspection
Inspect fuel line
every 6 000 km (4 000 miles, 12 months)
Inspect the fuel line in the following procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Inspect the fuel feed hose (1) for damage and fuel
leakage. ...