Special tools and equip
PrecautionsBalancer shaft journal bearing removal and
installation
Refer to “engine bottom side disassembly” (page 1d-
49).
Refer to “engine bottom side assembly” .
Removal
Remove the balancer shaft journal bearings (1).
Note
do not remove the bearings (1) unless
absolutely necessary.
Make a note of where the bearings are
r ...
Throttle valve synchronization
Check and adjust the throttle valve synchronization
among four cylinders.
Start the engine and run it in idling condition
for
warming up.
Stop the warmed-up engine.
Lift and support the fuel tank. Refer to “fuel
tank
removal and installation” in section 1g (page ...
Exhaust control valve inspection
Inspect exhaust control valve
initially at 1 000 km (600 miles, 2 months) and every
12 000 km (7 500 miles, 24 months) thereafter
Inspect exhaust control valve as follows:
remove the left side cowling. Refer to “exterior parts removal and
installation” in section 9d .
Check t ...