Engine coolant solution
Location of partsEngine top side assembly
Assemble the engine top side in the reverse order of
disassembly. Pay attention to the following points:
Cylinder head
Install the dowel pins and a new cylinder head gasket
(1) to the cylinder.
Caution
use a new gasket to prevent gas leakage.
Place the cylinder head ...
Regulated voltage inspection
Inspect the regulated voltage in the following
procedures:
remove the front seat. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Start the engine and keep it running at 5 000 r/min
with the dimmer switch turned hi position.
Measure the dc vo ...
Emission control warranty
Suzuki motor corporation warrants
to the ultimate purchaser
and each subsequent purchaser
that this vehicle is designed, built,
and equipped so as to conform at
the time of sale with all U.S. Emission
standards applicable at the
time of manufacture, and that it is
free from defects in materi ...